Test methods
Load products over long periods and many cycles while monitoring them continuously.
The first test shows whether a product works. Only endurance testing shows whether it will continue to work for years. This requires test benches that run reliably for weeks, load several devices in parallel and document every cycle.
MCF builds endurance test benches with cyclic control, load profiles, continuous measurement monitoring and automatic shutdown in the event of a fault. Trends and drift are evaluated over the full runtime, and every failure is documented with a timestamp and measurement history.
Classification
This test method is primarily associated with one phase of the product lifecycle.
Whether as a stand-alone test station or part of an integrated concept spanning several lifecycle phases, MCF configures the method for your device, volumes and process environment – including contacting, measurement technology, test software and documentation.